Cost savings by reducing the amount of memory consumed by SAP systems, establishing monitoring and increasing performance
In the course of regular database housekeeping activities, an automotive manufacturer noticed that memory consumption, and thus the bill for SAP systems, had risen sharply. Since SAP, as the manufacturer, provides guidelines for the growth rates that can be expected from regular operation, it was quickly determined that the situation at hand deviates greatly from the guidelines.
The goal of the project was to stop this disproportionate growth, reduce existing storage consumption, and thereby save seven-figure annual costs in both the short and long term.
In addition, the performance of certain tables suffered from the high memory consumption.
The task of BITS, together with a technical team from the customer, was first to analyze the causes of the high consumption, to derive measures from this and to supervise their implementation. Both project planning and especially technical project management were the main fields of activity.
Challenge
The challenges presented themselves in different dimensions. Thus, it was first necessary to determine at a high technical level which systems in which platform caused the most consumption and the highest growth rates. Afterwards, a potential analysis was carried out to determine in which area the fastest and most effective results could be achieved.
The project also aimed to analyze and improve the declining performance values of the affected systems.
Since some of the systems identified were production-critical systems, the path with the lowest risk was selected after a risk analysis.
Realization
The technical analysis phase was followed by the derivation of the necessary measurements and the validation of the options with regard to their feasibility in coordination with the platform owners and the SAP Basis team.
Depending on the technical requirements and the interaction of internal processes of the IT infrastructure, a milestone plan including concrete measures was developed to achieve the greatest starting points and effects.
Interim status & outlook
Once the planned approach was approved, the focus shifted to the current phase of the project, implementation.
The first measures were launched with high expectations and the decision to take the safe route immediately proved to be the correct one. This is because technical implementation once again poses a number of challenges.
The implementation of the planned measures is currently underway and will be implemented over several weeks.
BITS continues to accompany the project for the clarification of emerging issues in the context of the implementation as well as in the project management, since in the meantime also the service providers and SAP as manufacturer are involved, the focus has meanwhile shifted strongly from the technical analysis to the project management.
Projektrollen im Überblick
Die Experten/innen der BITS übernahmen folgende Rollen in diesem Projekt.
Further information on the SAP cost reduction case study
Tools & Technologien
Folgende Tools und Technologien kamen in diesem Projekt zum Einsatz.
KONTAKT
Möchten Sie mehr erfahren?
Sind Sie interessiert daran, mehr über die Möglichkeiten der Digitalisierung in Ihrem Unternehmen zu erfahren? Stehen Sie vor ähnlichen Herausforderungen oder haben konkrete Projekte in ihrem Unternehmen geplant? Kontaktieren Sie uns gerne für eine ausführliche Beratung.
Senden Sie uns gerne direkt eine E-Mail an [email protected] – wir freuen uns darauf, mit Ihnen zusammen die Zukunft Ihrer IT-Landschaft zu gestalten!
Sie können auch ein Termin direkt in unserem Kalender vereinbaren.